Kirkland residential framing
Drone and close-up views of the house and detached units during framing.
Every photo on this page is a TBG crew's work — no stock images, no other subs' frames. Drone shots, straight off the site.
The same multifamily site across one season — the sequence every GC schedules around, and the part TBG owns.
Pad graded, plates chalked, anchor bolts verified against the structural sheets before a single stick goes up.
Wall panels built and staged flat on the deck — crane time planned so lifts never wait on lumber.
First lifts standing, shear walls nailed per schedule, next building already topped out behind.
Three stories framed, sheathed, and ready for inspection — handed off clean for MEP rough-in.
Progress photos from four TBG residential projects in Kirkland, Bellevue, Seattle, and Tacoma.
Drone and close-up views of the house and detached units during framing.
Two aerial views show the floor system and exterior walls taking shape.
Street and upper-level views of the multi-building wood framing.
Side-by-side homes during wall and roof framing.
Multifamily, townhome, and commercial frames across the Greater Seattle Area — each one delivered on the GC's schedule.










Backyard cottages and additions get the same crews we send to 200-unit sites. See the ADU & DADU framing page →